Pothole Repair Kit

Our pothole repair kit range covers the products used to prepare, seal and finish repairs in asphalt and tarmacadam. Cold joint sealer bonds new material to the cut edges, while overbanding tape seals the finished joint.

Reinstatement Products For Car Parks and Roads - Ready Set Supplied

19 Products

  • ProSolve Short Handled Tar & Bitumen Brush - Ready Set SuppliedProSolve Short Handled Tar & Bitumen Brush1 inchPBRUSH1
  • ProSolve Square Tar Brush Head - Ready Set SuppliedProSolve Square Tar Brush HeadPVTBHEAD
  • ProSolve Short Handled Tar & Bitumen Brush – Coco - Ready Set SuppliedProSolve Short Handled Tar & Bitumen Brush – CocoPVTBSH
  • ProSolve Long Handled Tar & Bitumen Brush - Ready Set SuppliedProSolve Long Handled Tar & Bitumen BrushPVTARBLH4B
  • Overbanding Bitumen Tape BBA/HAPAS Approved. 35mm x 5m - Ready Set SuppliedOverbanding Bitumen Tape BBA/HAPAS Approved. 35mm x 5m

    Overbanding Tape

    Quantity
    Single Roll Box of 12
    Dimensions
    5m × 35mm
  • ProSolve ProTherm Overbanding Tape – Black, 35mm × 5m - Ready Set SuppliedProSolve ProTherm Overbanding Tape – Black, 35mm × 5mPVPTB35
  • Prosolve Bitumen Cold Joint Sealer 750ml - Ready Set SuppliedProsolve Bitumen Cold Joint Sealer 750ml
  • ProSolve Asphalt Rake with Ash Handle - Ready Set SuppliedProSolve Asphalt Rake with Ash HandlePVRAKEHDWS
  • ProSolve Bitumen Jointing Strips - Ready Set SuppliedProSolve Bitumen Jointing Strips20mm × 40mm × 4mPVBJS40

    ProSolve Bitumen Jointing Strips

    Size
    20mm × 40mm × 4m 12mm × 60mm × 6m +2 more
  • ProSolve Heavy Duty Steel Asphalt Rake - Ready Set SuppliedProSolve Heavy Duty Steel Asphalt RakePVRAKEHD
  • ProSolve Galvanised V-Lip Tar Bucket – 3 Gallon
  • Galvanised Contractor Pouring Can 12L (3 Gallon) - Ready Set SuppliedGalvanised Contractor Pouring Can 12L (3 Gallon)
  • ProSolve Bitumen Primer & Seal – 5L - Ready Set SuppliedProSolve Bitumen Primer & Seal – 5L5LPVBPRI5
  • PAK Spray Tar Detector - Ready Set SuppliedPAK Spray Tar Detector
  • Wax jute tarmacadam sheet - Ready Set SuppliedWax jute tarmacadam sheet12' x 9'

    Wax jute tarmacadam sheet

    size
    12' x 9' 15' x 12' +2 more
  • Propane Blow torch - Ready Set SuppliedPropane Blow torch
  • T99 Asphalt Release Agent - Ready Set SuppliedT99 Asphalt Release Agent
  • ProSolve Bitumen Cold Joint Sealer 750ml Box of 12 - Ready Set SuppliedProSolve Bitumen Cold Joint Sealer 750ml Box of 12
  • Economy Insulated Tarpaulin - Ready Set SuppliedEconomy Insulated Tarpaulin12x9

Pothole Repair Products

The joint between old and new asphalt is the weak point in a patch. If water gets in, traffic and freeze-thaw movement can start breaking the edge away. Cold joint sealer coats the vertical face before the repair material goes in, while overbanding tape seals the top of the joint after compaction. 

Wax jute sheets and insulated tarpaulins keep tarmacadam hot during transport, while the tar detector, release agent and pouring can cover the preparation and handling work around the repair.

Shop similar collections: Overbanding Tape | Insulated Sheeting | Thermoplastic Line Marking | Line Marking Paint

Cold Joint Sealer and Overbanding Tape

The two sealing products work at different stages of the repair. The ProSolve Bitumen Cold Joint Sealer is a ready to use 750ml aerosol applied to the clean vertical edges before hot or cold asphalt is laid. It creates a tack coat between the existing surface and the new material. 

Overbanding tape goes on after the repair has been compacted. The HAPAS-approved thermoplastic tape measures 35mm wide by 5m long and forms a waterproof seal across the surface joint. It is applied with the single-head propane torch which comes with an adjustable regulator and three-metre hose.

FAQ

What Should a Pothole Repair Kit Include?

A pothole repair kit should include the specified asphalt repair material, edge sealer, compaction equipment and a product for sealing the finished joint. 

What Is the Difference Between Cold Joint Sealer and Overbanding Tape?

Cold joint sealer is applied to the vertical edges before the repair material is laid while overbanding tape is heated across the surface joint after the repair has been compacted.

Do I Need a Torch to Apply Overbanding Tape?

Yes. Thermoplastic overbanding tape needs to be heated with a propane torch until it bonds to the asphalt. Cold joint sealer is applied directly from the aerosol and does not need heat.

How Do I Keep Hot Tarmacadam Warm During Transport?

Cover the load with a wax jute sheet or insulated tarpaulin. The wax jute sheet suits shorter journeys, while the padded waterproof tarpaulin retains more heat during longer trips and poor weather.